Haltyrbulak

Location

East and Central Kazakhstan

Commodity

Expansion Underway

Stage

Pre-Production / Advanced Exploration

Ownership

Core Mining Group Ltd. (Kazakhstan subsidiary)

Operator

Hudson Heartland (Operational Partner)

License Type

Mining and Exploration Licenses (combined area over 54 km²)

Overview

Hudson Heartland, through Core Mining Group Ltd., is expanding two open-pit gold mines in Kazakhstan – Vasilyevskoye-Boko (VB) and Zhaltyrbulak (Z). Both assets are currently producing gold via heap leaching of oxide ore and are being upgraded for long-term sulphide ore processing. The project generates approx. $10M USD/year in current cash flow, with significant growth potential through resource expansion and infrastructure upgrades.

Resource Estimate

Combined Oxide and Sulphide Resources:
– Vasilyevskoye-Boko: 18.8 million tonnes @ 1.65 g/t Au
– Zhaltyrbulak: 15.7 million tonnes @ 1.11 g/t Au
Total Estimated Gold: Over 1.4 million ounces (NI 43-101 compliant, indicated and inferred)

Mining Method:

Both mines are open-pit operations with current oxide production and plans for deepening into sulphide zones.
– Strip ratios: VB = 1:5.8 | Z = 1:4.2
– Waste management and expansion plans in place

Processing:

 – Existing heap leach operations active at both sites
– VB upgrades include new crushers, agglomeration unit, resin-stripping, and on-site doré production
– Sulphide Processing Plants (Under Construction):
 • VB: Refractory ore – BIOX®, flotation, grinding, CIL circuit
 • Z: Free-milling ore – Conventional CIL plant
 • Each: 2M tonnes/year capacity
 • Tailings: Dry stack integrated with leach pad infrastructure

Infrastructure:

 – Grid power, water treatment, on-site labs, full employee housing
– New western-style accommodation at VB
– Power upgrades underway for sulphide plant capacity

Strategic Highlights:

 – Currently cash-flow positive
– Forecast AISC: $1,130–$1,167/oz
– Combined NPV (10%, after tax): $108M USD
– IRR: 18–24% depending on gold price and hedge
– Capex: $225M total incl. acquisition, processing plant, infrastructure
– Hedging optionality with gold pricing above $1,800/oz

Status

Operational with oxide heap leach; sulphide plant at Z under construction; VB sulphide in final design phase.

Management:

Operated by Hudson Heartland with Canadian and expatriate site leadership. Local technical and operational staffing in place.

Technical Contact

William Coverdale – Mining Engineer (VB & Z)

Eric Hinton, P. Eng., FCIM

Hudson Heartland